·Î±×ÀÎ ÆäÀÌÁö
 
  ÇÇÀÌ¿¡½º ASP ÇÁ·Î±×·¥ ¸ñ·Ï º¸±â
ÇÇÀÌ¿¡½º ASP ÇÁ·Î±×·¥ º¸±â
[13 / 26] [ÀÚ·á¼ö : 257]
   
No.
Á¦         ¸ñ
µî ·Ï ÀÚ
µî ·Ï ÀÏ
Á¶È¸¼ö
 142   Fabrication Weight-Cost Calculation V3.0     pes21   2006/02/16 (17:29)   1533
 141   Deaerator Founfation load V1.1     pes21   2006/02/16 (17:29)   1578
 140   Horizontal vessel foundation load V1.1     pes21   2006/02/16 (17:29)   1473
 139   API650 Rectangular Tank Foundation Load V1.0     pes21   2006/02/16 (17:29)   1609
 138   Pressure Vessel foundation load V1.0     pes21   2006/02/16 (17:29)   1599
 137   Fabrication welding man hour calculation     pes21   2006/02/16 (17:29)   1590
 136   Fabrication welding man hour calculation     pes21   2006/02/16 (17:29)   1637
 135   Fabrication-cost estimation pgm-API650     pes21   2006/02/16 (17:29)   1389
 134   Thermal coefficient at tube side V1.0     pes21   2006/02/16 (17:29)   1459
 133   Girth flange-Shell deposit calculation     pes21   2006/02/16 (17:29)   1602
[-30] [-29] [-28] [-27] [-26] [-25] [-24] [-23] [-22] [-21] [´ÙÀ½]
[ÀÌÀüÀ¸·Î] [´ÙÀ½À¸·Î] [ȨÀ¸·Î]

°Ë»ö ¹üÀ§